It's a work in progress. I'll remove the directional arrows on the carpet once they are all down. I just finished the printer stand. And I'm working on the cutter stand now.
its taking a while to get everything setup. I finally have the cutter together and the printer standing upright. I just finished taking a 50amp hot tub wire and running it into a small beaker box. Now I have my (2) 220volt plugs and my (1) 110volt plug. And the 50amp breaker feeding the box is GFI protected.
I still have to install the "optional take up reel" on the printer and then turn it on and slap all the ink into it. All $580.00 worth of ink.
I'm going to be printing by tomorrow for sure. I just like a few more floor tiles and I need to bring one of my Macs into that room.
Its alot closer now than it was this time last week. It was an open air back patio.. Now is a nice warm office with all the amenities....
I still have the directional arrows stuck to each floor tile. I usually do till I'm completely finish the whole job. It just keeps me from turning 2 tiles the same way.